X-Rite 504 SpectroDensitometer Betreibershandbuch Seite 15

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 126
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 14
OVERVIEW AND SETUP
1-3
Unpacking and Inspection
After removing the instrument from the shipping carton,
inspect it for damage. If any damage has occurred during
shipping, immediately contact the transportation
company. Do not proceed with installation until the
carrier’s agent has inspected the damage.
Your instrument was packaged in a specially designed
carton to assure against damage. If shipment is necessary,
the instrument should be packaged in the original carton.
If the original carton is not available, contact X-Rite to
have a replacement carton shipped to you.
Packaging Drawing and Parts List
Check your packaging contents against your packing list
and original order. A detailed packaging drawing and
parts list are included in the appendices of this manual.
Shoe Lock Operation
To take measurements with the instrument, you must
unlock the shoe. When the instrument is not in use, the
shoe should be re-locked to protect the instrument optics.
A rotating latch on the bottom of the instrument locks the
shoe closed.
To unlock, hold shoe against the instrument and
rotate latch. Align latch so that it fits through the
cutout in the shoe. Carefully release the shoe to open.
To lock, hold shoe against the instrument and rotate
latch to catch the detents in the shoe.
Lock Position
Latch
Detent
Unlock Position
Seitenansicht 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 125 126

Kommentare zu diesen Handbüchern

Keine Kommentare